Maintenance and Repair of Shuttle Landing Facility (SLF), Space Florida
CSS served as the prime contractor performing comprehensive facilities management for the Shuttle Landing Facility (SLF) and accompanying facilities.
![shuttle landing facility](https://intranet.css-inc.com/wp-content/uploads/2022/08/slsl-1024x465.jpg)
CSS served as the prime contractor performing comprehensive facilities management for the Shuttle Landing Facility (SLF) and accompanying facilities. Now called the Launch and Landing Facility (LLF), it is one of the longest runways in the world at 15,000 feet, serving NASA and private aviation and commercial science companies. CSS assisted Space Florida in transitioning the SLF, air traffic control tower, and all supporting services and equipment from a NASA-owned asset to a Space Florida asset between 2013 and 2017. We performed a comprehensive facility condition assessment to identify the status and operational capability of the facility for Space Florida. We conducted numerous repair and preventive maintenance tasks to preserve and upgrade the current state of the facility and accommodate real-time operations; executed improvement projects to enhance the visual appeal and utility of several buildings; and provided just-in-time repairs to the runway pavement and lighting systems to ensure safe operations for critical missions including the U.S. Air Force X-37.
Additional Projects
![](https://intranet.css-inc.com/wp-content/uploads/2022/08/iStock-508058848-740x434.jpg)
Analytical Support for the Drinking Water Emergency in Flint, Michigan
Helping 100,000 Residents Affected by Elevated Lead Levels in Local Water Supply Lead contamination found in the drinking water in Flint, Michigan had a catastrophic impact on the community and its residents. CSS supported EPA’s response to the crisis by providing mobile and fixed analytical laboratory services and data review. Over a nine-month period, our…
![](https://intranet.css-inc.com/wp-content/uploads/2022/08/iStock-187295559-740x434.jpg)
Bureau of Engraving and Printing (BEP) ES&H Support
CSS provided on-site environmental, safety, and health support 24 hours per day/five days per week to support approximately 1,900 employees occupying 1.4 million square feet of floor space at BEP’s Washington, DC, facility (DCF).
![](https://intranet.css-inc.com/wp-content/uploads/2022/08/Analysis-for-Coastal-Operational-Resiliency-740x434.jpg)
Analysis for Coastal Operational Resiliency
CSS assisted with planning and executing a demonstration of three decontamination technologies on a USCG vessel contaminated with a benign surrogate for anthrax.
![](https://www.css-inc.com/wp-content/uploads/2022/06/sample.png)
Get in touch
Contact us to learn more about our projects, capabilities, solutions, and service offerings.